Helston Athletic
One of our earlier projects in 2015 down in Cornwall, where we installed Floodlights, a 100 Seat Covered Stand, a Concrete Walkway, a Galvanised Steel Tube Barrier, a Public Address (PA) system and Wooden Perimetre Fencing.
In 2025 we added our first ever fully Galvanised Covered Standing structure for the club to meet the Step 4 deadline along with 2 free standing Turnstile mechanisms.

