Home
Wakefield Trinity logo featuring a white fleur-de-lis on a dark blue shield background

Wakefield Trinity

Open Terracing 36 metres long


This was an ambitious project that we took on in the Winter with a tight delivery timeframe of the end of January 2025 ahead of the clubs first season at Rugby Super League level.

This was to sit in front of a hospitality area with the profile needing to be an exact match up to the steps of the hospitality unit.

This was a completely bespoke development with 9 steps of 155mm Height, and was the first time that we used our upgraded crush barriers of 50mm x 100mm that were tested on site by industry leading specialist KIWA to 2.4kN.

Get In Touch